top of page

Technical Assignment II

Technical Assigment II

 

Technical Assignment II focuses on the production schedule, cost, and site logistics for one specific building system.  This report also briefly investigates alternative construction means and methods if the project team had different or more resources.

 

 

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐ progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Kenna Markel. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

This page was last updated on April 21, 2016 by Kenna Markel and is hosted by the AE Department ©2015

bottom of page